Curis au Mont d'Or - Block plan - Sophie AUGUSTE
-
-
-
-
-
-
The project consisted of dividing the plot in two to build a second house.
The sloping terrain and the orientation of the terrain allow us to:
We have been able to optimize the implementation of the construction in the field, despite its constrained size and geometry.
La phase Direction de l'Exection des Travaux début début janvier, pour le projet de construction d'un restaurant scolaire annexe. Le projet comprend une partie rénovation et une partie extension. Les travaux auront une durée de 9 mois.
The land comes from a division of this land. The plot has an area of 387m2, the house has a floor area of 124m2, and the garage has an area of 40m2. The old barn is renovated into a house.
The renovation operation consists of reclaiming the shaded areas, clarifying all the ancillary rooms and finding a harmonious plan for the life of a family. Not only ...
The company Trois C intervened as Interior Architect (Co-contracting with Synapse Construction) for the restructuring of the restaurant / self-service areas, followed by construction site ...